TAITEN
Energy Storage Site Controller
ADVANTAGE
Advantages of Energy Storage Site Controller
The core advantage lies in its high integration and rapid deployment: through deep integration of PCS, BMS, and fire protection systems, it eliminates communication delays and achieves millisecond-level action. The built-in self-scanning algorithm further shortens the on-site commissioning time for 1GWh scale projects from several weeks to 12 days.
Full-Stack Minimalist Coordination
Integrates PCS (SiC silicon carbide technology), liquid cooling system, BMS, FSS (fire suppression system), and BSC (battery symmetry compensation). The local controller achieves “one-click full system docking,” significantly reducing communication delays.
1-Hour Automatic Networking
Supports “self-scanning, self-configuration, and self-calibration.” It can complete system self-check from power-on to pre-grid connection within 60 minutes, shortening the on-site commissioning time for 1GWh scale projects to 12 days.
Industrial-Grade Resilient Safety Defense
Dual Power Supply automatic switching design ensures that controller can still maintain monitoring of fire suppression (FSS) and cooling systems during main power anomalies, preventing the spread of catastrophic accidents.
Intelligent Diagnosis and Asset Optimization
Achieves “cell-level” health monitoring. Through big data prediction, it can proactively identify abnormal battery internal resistance and coordinate with BSC for active balancing, solving the common “barrel effect” (capacity limited by the weakest battery) in energy storage systems, and improving system RTE (Round-Trip Efficiency) to over 92%.